GGC Project Plan Information Booklet
INFRASTRUCTURE NEEDS
Over the past 12 months, the Board has worked with well-respected professionals proficient in golf course infrastructure and development to identify the required infrastructure needs that comprise the majority of work proposed in the Golf Course Project Plan. These topics include:
STATE OF INCONSISTENT PLAY IN OUR BUNKERS
Bunker drainage no longer functions properly because of clogged pipes and wetter conditions due to atypical rain events and irrigation.
Failed bunker drainage lines cause the sand to become contaminated earlier than the standard 5-7 year replacement schedule.
This combined with the constant animal damage to the bunker liners and edges has resulted in the need to rebuild all of our bunkers.
THE FAILING IRRIGATION SYSTEM - 7 Irrigation Main Line Ruptures in 2023 & 2024
The constant water leaks do not allow our pump system to maintain the proper pressure and is diminishing the expected life of the $300,000 pump installed just 2 years ago. The obsolete satellite computer systems are routinely malfunctioning.
Our maintenance team is repairing leaks, heads and electronic failures in the system on a nearly daily basis. These failures impact our ability to maintain exceptional course conditions and our ability to provide a premier playing experience.