GGC Project Plan Information Booklet
To add new excitement to the Glenwild playing experience, and consistent with best practices for premier courses when replacing bunker and irrigation systems, the Golf Course Project Plan incorporates course enhancements that would be completed concurrent with the infrastructure work. While the proposed work would not commence until Fall 2026, in order to secure the best possible crew and pricing, we must commit to our projects 18-24 months in advance. THE GOLF COURSE PLAN
REQUIRED INFRASTRUCTURE PROJECT PLAN ELEMENTS
GOLF COURSE ENHANCEMENT PROJECT PLAN ELEMENTS
Replace the entire irrigation system including all pipes, wiring, connectors, valves, heads and system controllers. Rebuild the bunkers to install proper drainage and improve the liners using today’s state-of-the art materials. Reconstruct all cart paths with either asphalt or concrete. Level and resurface all existing tee boxes.
Adjusted bunkers to provide more play space and better angles for today’s player; give them the look and feel of a Fazio mountain course. Improved aesthetics and conditioning along with more pin placement through green adjustments. Reconfiguration of tee boxes to ensure distances, angles and carries provide improved playability, variety and equity from the tees. Reconfiguration/redesign of two holes to provide an exciting short par 3 and par 4 that would be consistent with those found on the best golf courses. Proper drainage throughout the golf course. A championship level course with more distance variety and teeing options.
Marty & Tim Visit About the Glenwild Golf Course Project Plan The conceptual golf course enhancements proposed for each hole can be found in the Appendix beginning on page 20..